China to Philippines Sea and Air Freight Line|Manila/Cebu FCL/LCL International Logistics
We are a professional international freight forwarder, providing one-stop logistics services for sea and air freight from South China ports to the Philippines. Sea freight FCL and LCL depart from Yantian and Nansha directly to Manila North Port, South Port and Cebu Port, and air freight direct from Guangzhou Baiyun Airport to Manila Ninoy Aquino International Airport. export and import customs clearance (DDP) optional, local customs clearance in the Philippines, PS/ICC imported goods certification agency . Whether your goods are furniture and building materials, machinery and equipment, clothing, shoes and hats, or cross-border e-commerce stockings, you can enjoy a full logistics experience from one order to the next.
| 8-12 days Door to door shipping |
2-4 days Direct air transport |
Manila North/South, Cebu Major ports |
24 hours Quote response |
Our service plan
Shipping FCL / LCL
Provides 20-foot container (20GP), 40-foot container (40GP/40HQ) full container transportation, and LCL services. Departing from Shenzhen Yantian Port, Shekou Port and Guangzhou Nansha Port, the direct sea voyage to Manila North Harbor and Manila South Harbor takes about 5-8 days, and the door-to-door journey takes about 8-12 days; to Cebu Port (Cebu), it takes about 10-14 days to transit through Manila. Commonly used shipping companies include Maersk, CMA CGM, COSCO, WHL, and Yang Ming, with multiple direct flights every week. Suitable for stocking large quantities of goods, engineering equipment, furniture and building materials, and cross-border e-commerce.
Air express express line
Air transportation is direct from Guangzhou Baiyun Airport to Manila Ninoy Aquino International Airport (MNL). The flight time is about 2 hours and 20 minutes. China Southern Airlines and Philippine Airlines have direct flights. The entire air transportation including picking up the goods and customs clearance takes about 2-4 days. Standard air freight channels can be delivered within 2-4 days, and express express channels (DHL/FedEx/UPS) can be delivered within 1-3 days. . Cebu, Davao and other provinces can be transported by land from Manila. Suitable for high-value goods, emergency materials, aviation AOG, and cross-border e-commerce urgent orders.
Customs clearance at destination port/local delivery
We have a cooperative customs broker in Manila and are familiar with the customs clearance procedures of the Philippine Bureau of Customs (BOC) and the Department of Trade and Industry (DTI). The Philippines implements compulsory PS/ICC certification for imported goods: the PS mark is applicable to locally produced and imported specific products (electrical appliances, building materials, chemicals, etc.). The ICC Import Commodity Clearance Certificate (Import Commodity Clearance) is issued by the Philippine Bureau of Standards BPS before or after arrival at the port. We can assist with PS/ICC certification, preferential tariffs of origin (China-ASEAN Free Trade Agreement ACFTA Form E), and arrange truck delivery within Metro Manila, and from other provinces to Cebu, Davao, Cagayan and other places.
LCL economic solution
For customers whose cargo volume is less than 10 cubic meters (<10 CBM), it is recommended to choose LCL service, which is billed according to volume/weight. There is no need to ship the whole container, which greatly reduces the trial order cost for small and medium-sized enterprises. The shipping schedule is fixed every week, and the LCL warehouse is located in Yantian, Shenzhen. It can arrive at the Port of Manila 4-7 days after customs clearance.
Timeliness and reference price
| Service method | Transportation timeliness | Suitable for cargo | Price |
|---|---|---|---|
| FCL 20GP→Manila | 8-12 days | Large volume cabinet | Inquiry |
| FCL 40HQ→Manila | 8-12 days | Very high volume equipment | Inquiry |
| LCL LCL→Manila | 10-14 days | <10 CBM small batch | Inquiry |
| Air freight standard→MNL | 2-4 days | Urgent High Value | Inquiry |
| Air Express→MNL | 1-3 days | AOG Medical Emergency | Inquiry |
Documents required for export to Philippines
- Commercial Invoice and Packing List
- Certificate of Origin (C/O), it is recommended to apply for China-ASEAN Free Trade Agreement Form E to enjoy preferential tariffs
- Sea waybill B/L or air waybill AWB
- Export Customs Declaration (China Export Declaration)
- Philippine PS/ICC imported goods certification (BPS is enforced by the Bureau of Product Standards for electrical appliances, building materials, chemicals, etc., and ICC certificates must be applied for before arriving in Hong Kong)
- Importers must register with the Philippine Bureau of Revenue (BIR) and the Bureau of Customs (BOC) and obtain an importer code
- Wood products, food, cosmetics, and medical devices require corresponding import licenses (FDA/DNI, etc.)
We are an approved international freight forwarder, undertaking all types of export transportation from China to the Philippines. Personalized quote within 24 hours . Whether your goods are furniture, building materials, machinery and equipment, clothing, shoes and hats, e-commerce packages or project materials, you can contact us to get a solution.
FAQ
How long does it take to send a container from China to the Philippines?
The direct flight from Shenzhen Yantian to Manila North Port takes about 5-8 days, and the door-to-door journey takes about 8-12 days; it takes about 10-14 days to transit through Manila to Cebu Port. By air, it takes about 2-4 days to arrive at Manila Ninoy Aquino International Airport.
Which ports and airports are mainly used for importing to the Philippines?
The main import gateways of the Philippines are Manila North Port and Manila South Port, responsible for more than 60% of the country's container throughput; Cebu Port is the core port of the Visayas. The air transportation gateway is Manila Ninoy Aquino International Airport (MNL), followed by Cebu Mactan Airport (CEB).
Is it necessary to apply for PS/ICC certification in advance when exporting to the Philippines?
Yes. The Philippines Bureau of Product Standards (BPS) requires products included in the mandatory list (such as household appliances, lamps, building materials, cement, steel products, etc.) to apply for an ICC import customs clearance certificate before shipment or when arriving at the port. Otherwise, the goods will not be cleared after arrival at the port or even be returned. We can assist with this certification. It is recommended to provide a product list before booking for advance judgment.
Get Philippines logistics quote now
Please provide: goods name, volume/weight, departure city, delivery address (Manila, Cebu or other cities), we will customize a sea/air freight plan for you within 24 hours, including freight, customs clearance fees, and delivery fee details.
Contact information
Business contact: Mr. Zhou
Mobile phone/WeChat: 13641409693
Email: Richchou.coc@gmail.com
