Market Access and Compliance in Pakistan

Photovoltaic product export to Pakistan IEC standards, test reports, PSI and COC price timing processing methods

English translation of the Chinese source. Source publication date: 2 July 2022. Regulatory requirements, charges and schedules may have changed; confirm the current position before shipment. Processing and freight estimates are not guarantees.

Photovoltaic product export to Pakistan IEC standards, test reports, PSI and COC price timing processing methods


Currently not all products are required to require PSI, currently only for photovoltaic products


The Ministry of Commerce of Pakistan promulgated SRO 604(I)/2019, which includes import requirements for photovoltaic products, as well as specific regulations for mandatory PSI and COC certification. Currently, not all products are required to require PSI, but only photovoltaic products. Including but not limited to solar photovoltaic systems, off-grid or independent solar photovoltaic systems, solar photovoltaic modules, solar photovoltaic panels, solar photovoltaic cells, inverters, charge controllers, photovoltaic system balancing components, low-voltage switchgear and control equipment, power converters for photovoltaic power systems, insulated cables for photovoltaic systems, solar water pumps, solar water heaters with accessories, solar stoves, solar cookers, etc. and their parts.


At the same time, the new regulations clearly stipulate that only PSI and COC certificates issued by third-party organizations officially approved by the Pakistan National Accreditation Council (PNAC) can be recognized.

Pakistan photovoltaic.png

Application process:


Before applying for a Pakistan COC certificate, you must hold the following two reports:

1. PSI report

2. IEC test report


PSI report

1. Fill in the application form, provide packing list, commercial invoice to Shenzhen Beidou for inspection

2. After the data review, the organization will arrange personnel to go to the factory to inspect the goods. After the inspection is completed, a PSI electronic report will be issued.


Test report

The models involved in shipment must have an IEC report

1. If the manufacturer already has an IEC report, the test can be exempted (tip: the model number must be included in the test report)

2. If there is no report, you can contact the agency to re-send samples for testing. The testing timing is 10 working days.


Pakistan IEC standards, test reports, PSI and COC process methods, price and fee timing


2.1 For customers without IEC report:


Provide product information evaluation standard quotation for export orders---sign the contract and make payment---prepare information and test reports (1 week)---make an appointment for inspection (application 3-5 working days in advance)---on-site inspection (1 working day, if there is a rush to ship, the customer can pack and ship the goods after inspection)---issue PSI inspection report (3 working days)---submit the review application for COC certificate (certificate will be issued within 1 week after review).


2.2. For customers with IEC reports:


Sign the contract and make the payment --- Prepare the information and review the test report (3 working days) --- Make an appointment for inspection (apply 3-5 working days in advance) --- On-site inspection (1 working day, if you are in a hurry to ship, the customer can pack and ship the goods after inspection) --- Issue the PSI inspection report (3 working days) --- Submit the audit application for the COC certificate (certificate will be issued within 1 week after the audit is passed).


3. Certificate template


Pakistan PSI Certificate Template

Pakistan PSI Certificate.png

Pakistan COI certificate template

Pakistan coc certificate.png



If you are interested in testing standards, prices, fees, and timing, please contact us


Business Contact

Mr. Zhou Tel: 0755-26996192 13530227809

E-mail: Richchou.coc@gmail.com

————END—————



Discuss your shipment

Access World Trade(Shenzhen)Co.,Ltd

WhatsApp: +86 13530227809; Richchou.coc@gmail.com

Share the destination, product description, HS code if available, quantity and planned shipment date.