What should be checked for the validity period of Kenya CoC?
CoC corresponds to a specific batch, and the same certificate cannot be used for another batch of goods. Please also check the inspection date, visa date, certificate remarks, planned shipment and actual customs clearance time, and first confirm the applicable caliber of the promissory note.
When does "90 days" start?
The old article on this page repeatedly stated 90 days but did not specify the starting date. The 2005 USDA government report that has been obtained states that Route A at that time had a maximum of 90 days from the date of inspection and only one shipment. This is historical data. It cannot be used to determine that all routes in 2026 will have 90 days from the date of issuance, or that customs clearance and shipment nodes will be regarded as the same deadline. The current term is verified against the promissory note certificate and the authorized issuing authority/KEBS requirements.
CoC, Product Registration and Test Report
Batch CoC, Route B product registration, Route C license and laboratory report are not the same document. The registration or report is still valid and does not automatically prove that the batch of CoC can be reused or does not require pre-shipment assessment.
Does every ticket need to be retested and monitored for installation?
Document review, testing, inspection and applicable cabinet sealing/installation supervision requirements are determined based on product, route and supervisor arrangements. We cannot promise that all goods will be exempted from inspection, and we cannot state that all goods must be re-tested and the same type of full-process supervision is required.
Are postal/express shipments automatically exempt?
Cargo shipping labels do not equal regulatory immunity. Express parcels have their own destination inspection arrangements. Product exemptions must check the current conditions, and it does not mean that all postal parcels are exempt from all procedures.
