1. Mozambique regulatory authorities and quality control
In Mozambique, regulatory activities such as taxation, regulation and quality assurance are carried out by several government agencies:
The Ministry of Economic Affairs is responsible for ensuring that products meet quality standards and that businesses comply with trade regulations. The ministry also supervises the National Institute for Quality (INNOQ) and the National Inspectorate of Economic Activities (INAE).
INNOQ is responsible for setting and enforcing product and service standards in Mozambique. The agency works with other government agencies to ensure products comply with international standards. INNOQ is also responsible for providing certification for products and services that comply with relevant standards.
https://www.innoq.gov.mz/
https://www.facebook.com/people/Instituto-Nacional-de-Normaliza%C3%A7%C3%A3o-e-Qualidade-INNOQ/100064915111741/
INNOQ Internal Regulations: https://gazettes.africa/archive/mz/2021/mz-government-gazette-series-i-dated-2021-01-04-no-1.pdf
INAE is responsible for ensuring that industries comply with laws and regulations. The agency oversees product standards, quality control and price regulation. INAE also conducts inspections and takes action against businesses that violate consumer rights. The agency plays a vital role in promoting economic growth and protecting public health and safety.
https://www.facebook.com/inaeOficial/
INAE Internal Regulations: https://gazettes.africa/archive/mz/2021/mz-government-gazette-series-i-dated-2021-07-20-no-138.pdf
The Ministry of Health is responsible for ensuring the safety and quality of food and medical products and for controlling the import and export of these products.
The Ministry of Agriculture, Environment and Fisheries also plays an important role in controlling the quality and safety of agricultural products.
The Ministry of Finance is responsible for tax collection and management. The Office of Taxation (AT) is the main government agency responsible for collecting taxes, including VAT and GST. The Department of Revenue is also responsible for tax administration, including taxpayer registration and compliance and the review of tax returns.
http://www.at.gov.mz/
As far as pre-shipment inspection is concerned, some imported products are subject to pre-shipment inspection, and this procedure is performed by Intertek, a company commissioned by the government. The inspection content includes verification of quality, quantity, price and tariff, so as to subsequently determine the tariff payable. A list of products requiring pre-shipment inspection is listed.
https://www.intertek.com.hk/government/psi-mozambique/
In terms of trade agreements and regional organizations, Mozambique is a member of the Southern African Development Community (SADC) and the Common Market for Eastern and Southern Africa (COMESA). These organizations aim to promote regional integration and cooperation in areas such as trade, investment and infrastructure construction. Mozambique is also a member of the World Trade Organization (WTO) and actively participates in negotiations aimed at promoting trade liberalization and improving market access for its products.
Overall, Mozambique’s regulatory framework is designed to ensure that goods and services produced and traded in the country comply with specific standards and regulations and to protect the health and safety of consumers. In addition, the country's membership in regional organizations and trade agreements helps it access larger markets and promotes economic growth.
For more information about regulatory and quality control laboratory contacts, see Section 4.1, “Government Contact List” and Section 4.3, “Laboratory and Quality Testing Company Contact List.”
2. Mozambique Customs
Duties and exemptions
For contact information for government customs authorities, please follow this link: 4.1 Mozambique Government Contact List
For more customs contact information, please select the following document: "Mozambique Customs Information Supplement"
For customs information on provincial customs offices, border crossings, immigration offices and customs information at each point of entry, please see the following document: Mozambique Customs Information
Exemptions from the regular regime (non-emergency response):
[Note: This section should contain information on the regular duty and tax exemption system for non-emergency periods (i.e. when no emergency is declared and processes are not streamlined, such as routine imports/development, etc.). 】
National Customs Legislation and Systems
··All United Nations agencies, NGOs and embassies that have signed agreements with the Mozambican government enjoy tax exemption.
··Mozambique Alfandagas reports to the Ministry of Finance
··The department responsible for customs and excise tax is the technical department at the headquarters in Alfandagas, Mozambique
Transit system
··After the goods arrive at the port of entry, all documents are handed over to the freight forwarder, who then prepares the import declaration (BoE), and the customs clearance agent submits the import declaration to the customs for processing.
··Please note: Documentation must indicate the proposed border point of departure from Mozambique.
··At the exit point, transit documents need to be submitted to the customs office designated at the exit point.
For weight and value grade information, please select the following documents:
Mozambique Customs Information Additional Information
cesartembe2@gmail.com
1. Exemption from the regular system (non-emergency response)
| Organizational Requirements to Obtain Tax-Exempt Status United Nations Agencies |
|---|
| Alfãndagas de Moçambique provides privileged importers with an application manual titled "Certificate of Entry of Duty Free Goods by Privileged Persons or Organizations". The application is completed by the importer and submitted to the Alfondagas regional office in Mozambique for approval. The specific steps are as follows: Upon receipt of the shipping documents, the designated customs clearance agent is required to prepare a customs declaration. The customs declaration and shipping documents are attached to the application for certificate of entry of duty-free goods by a privileged person or organization and submitted to the MRA regional office for certification. The application should list details such as the name and address of the organization, description of the goods and value of the goods in Mozambique Metical and the Customs Procedure Code IM4 (Import) The Customs Procedure Code (CPC) for Imported General System Consumer Goods) is 4000, the Customs Procedure Code (CPC) for a privileged organization or individual is CPC 4000430 (personal items) and 4000445/215 (goods used by the organization) and the application must be signed by the organization signatory For border clearance, certification is completed when the truck reaches the border |
| NGO |
| Same as United Nations agency |
2. Exemption from supporting document requirements
| Duty and Tax Exemption Certificate Documentation Requirements by Commodity Unnamed: 0_level_1 | Duty and Tax Exemption Documentation Requirements by Commodity Food | Duty and Tax Exemption Certificate Documentation Requirements by Commodity NFI (Housing, WASH, Education) | Duty and Tax Exemption Documentation Requirements by Commodity Pharmaceuticals | Duties and Taxes Exemption Certificate Documentation Requirements by Commodity Vehicles and Spare Parts | Duty and Tax Exemption Certificate Documentation Requirements by Commodity Employee and Office Supplies | Duty and Tax Exemption Certificate Documentation Requirements by Commodity Telecommunications Equipment |
|---|---|---|---|---|---|---|
| Invoice | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Air waybill/bill of lading/other transport documents | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Donation/Non-Commercial Certificate | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Packing list | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Other files | ||||||
| Additional notes | Additional notes | Additional notes | Additional notes | Additional notes | Additional notes | Additional notes |
3. Customs declaration - general information
| Customs information | Customs information.1 |
|---|---|
| Documentation requirements | |
| Embargo | |
| Prohibited Items | Certain drugs, protected species, weapons, imitations and counterfeit materials |
| General restrictions | Genetically modified goods are not allowed into Mozambique The following goods require a permit; soybeans, all cereals (including meal and flour), vegetable oils, fruits, eggs, poultry, fish, meat and meat products |
4. Customs clearance document requirements
| Customs clearance document requirements (by commodity) Unnamed: 0_level_1 | Customs clearance document requirements (by commodity) Food | Customs Clearance Documentation Requirements by Commodity NFI (Shelter, WASH, Education) | Customs clearance document requirements (by commodity) Pharmaceuticals | Customs clearance document requirements (by commodity) vehicles and spare parts | Customs clearance document requirements (by commodity) Employees and office supplies | Customs clearance document requirements (by commodity) Telecommunications equipment |
|---|---|---|---|---|---|---|
| D&T Exemption Certificate | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy |
| Invoice | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Air waybill/bill of lading/other transport documents | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Donation/Non-Commercial Certificate | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Packing list | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Phytosanitary Certificate | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies |
| Distribution plan | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | Yes, original, 1 copy | |
| Urgent File | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | Yes, original, 2 copies | |
| Additional notes | Additional notes | Additional notes | Additional notes | Additional notes | Additional notes | Additional notes |
| Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs | Please note: These requirements apply equally to UN and NGO Food commodities such as maize, CSB, DSM, millets, rice and vegetable oils require an import license before importation. INGC requires input from the destination province to confirm demand for imported goods. Drugs, pesticides and communications equipment require prior authorization from government agencies. In emergencies, the import process is conducted through INGC. Importation of office supplies is done through the Ministry of Health. foreign affairs |
3. Mozambique port assessment
Mozambique is a country with a long coastline of about 2,500 kilometers, stretching from South Africa in the south to Tanzania in the north, on the edge of the Indian Ocean. The country has several major ports along its long coastline, including Maputo, Beira and Nacala, which are important gateways for international trade with neighboring Swaziland, South Africa, Zimbabwe, Botswana, Zambia, the Democratic Republic of Congo and Malawi.
The main ports in Mozambique are:
··Port of Maputo (southern Mozambique);
··Port of Beira (Central Mozambique);
··Port of Nacala (Northern Mozambique).
There are other smaller ports in the provinces of Gaza (Port Saisay) and Inhambane, as well as in the cities of Quilimane and Pemba.
Despite its small size, Pemba Port has grown in importance in recent years and has become the fourth port to receive imported petroleum products for local consumption. With the implementation of the Rovuma Basin gas project, the importance of Pemba Port is increasing day by day.
The Port of Maputo is the port with the largest annual cargo throughput in Mozambique. The port is divided into two distinct areas: Maputo Cargo Terminal (also known as the Commercial Port) and Matola Bulk Terminal. Maputo Cargo Terminal covers the loading and unloading of coastal transport, general cargo, liquids (storage tanks), sugar, grain, containers, cars, steel, iron and molasses. The Matola Bulk Terminal handles coal, petroleum products, grains and aluminum.
The Port of Beira is expected to be the second largest port in Mozambique (in terms of annual cargo throughput) in 2024 and is one of the most important ports in the country. The port was rated the most efficient port in Southern Africa in 2024, according to the World Bank's Container Terminal Performance Index. The Port of Beira handled 412,000 TEU containers and 4.05 million tons of breakbulk that year. After upgrading, the port's cargo handling capacity has been increased from 4 million tons of breakbulk and 350,000 TEUs to 5 million tons and 900,000 TEUs per year respectively. The upgrades include the installation of modern cargo handling equipment and computer systems.
In the Southern African Development Community (SADC) region, ports are particularly prominent as strategic infrastructure, and a large part of the imports and exports of landlocked countries rely on these infrastructures.
The Port of Nacala is expected to become the third largest port in Mozambique (in terms of cargo throughput) in 2024 and is the largest natural deep-water port in East Africa, connecting the northern regions of Mozambique. Currently, the port has a general cargo terminal, a container terminal and a liquid bulk terminal (the latter is connected to a fuel depot). The port of Nacala is also connected by rail to Tete Province to facilitate the export of coal. In October 2023, the Nacala Port held an inauguration ceremony for the reconstruction, expansion and modernization project. After the renovation, the port's container handling capacity increased from 100,000 tons to 252,000 tons, an increase of more than 150%.
Reform and Port Mode
Port reforms implemented in recent decades and major port management models
Port management in Mozambique was initially the responsibility of the former National Ports and Railways Authority until 1989, when this function was transferred to the state-owned company Empresa Nacional de Portos e Caminhos de Ferro de Moçambique (CFM), created under Decree 6/89 of 11 May 1989.
As the country moves forward with the port concession system – especially in the ports of Maputo, Beira and Quelimane – CFM companies are replaced as operators of these ports by their respective concessionaires. In this context, the “landlord” model under the concession model based on public-private partnership has become the main port operating model in Mozambique.
The fuel terminals at Pemba Port and all ports nationwide continue to be directly managed by CFM.
Mozambique has no global national policy for port development. However, Resolution 5/96, adopted on 2 April 1996, approved Mozambique's transport policy, which established a chapter specifically to address port policy. The chapter establishes the following objectives related to the country's ports:
Improve port operational efficiency;
Encourage the modernization of management techniques, covering everything from operational issues to human resources;
Facilitate the participation of private capital in the construction of new infrastructure, port operations and port services through cooperation with state-owned port operators (joint ventures), through management contracts or full or partial concessions;
Facilitate the exploration of specialized marinas through the awarding of full or partial concessions to private entities (joint ventures).
Mozambique approved the Regulation on the Prevention of Pollution and Protection of the Marine and Coastal Environment on 30 November 2006 through Decree No. 45/2006.
This regulation sets out the basic principles that all ports must have adequate facilities to collect and treat multiple types of waste to deal with pollution.
According to this principle, port operators must:
Pollution Risk Management Internal Procedures Manual;
Guidance for the management of various wastes generated or derived from the handling and storage of oils and hazardous substances;
Individual contingency plans for contamination by hazardous oils and substances.
Mozambique has no legal framework specific to port development or operations. However, since all port and terminal concessions awarded to private entities fall under the public-private partnership (PPP) model, the activity is governed by the Transport Policy and the Public-Private Partnership Act and its related regulations.
Regulation of all ports is under the responsibility of a single agency. Before October 2021, this function was performed by the Ministry of Transport. However, in August 2021, the government established the Mozambican Institute of Railways and Ports (IFEPOM) through Decree No. 54/2021 of 19 October 2021 (Law on the Institute of Railways and Ports).
The Mozambican Port Regulatory Authority is responsible for supervising, regulating, managing and inspecting various activities in the port system, including:
Monitor the performance of concessionaires and port operators and ensure that their activities comply with the law and the corresponding concession contracts.
··Oversee the implementation and application of security measures at port facilities.
··Certification of national port facilities’ compliance with the ISPS Code and other applicable legal standards.
··Develop policy recommendations for national port development and management.
··Licensing and inspection of port operations and infrastructure.
··Licensing and regulation of port infrastructure construction.
··Issuing licenses to legally established port operators and overseeing the certification of their equipment.
··Promote free competition, prevent and take necessary measures to combat anti-competitive behavior and abuse of market dominance.
··Coordinate with other entities to regulate the opening or closing of ports and port terminals.
4. Mozambique Airlines
For important airport information please visit:
http://worldaerodata.com/
https://www.aeroportos.co.mz/
Civil aviation is an important part of Mozambique's transportation system due to its vast size: the country spans more than 2,300 kilometers from north to south, and a poor road network makes land transport too slow.
The Civil Aviation Authority of Mozambique (IACM – http://www.iacm.gov.mz/) is the regulatory body for all aviation activities.
The national airline of Mozambique (LAM – http://www.lam.co.mz/) only covers domestic routes and some neighboring countries such as South Africa, Tanzania, Kenya and Zimbabwe. Many international airlines such as South African Airways, Kenya Airways, Ethiopian Airlines, TAAG Airlines, Qatar Airways, TAP Air Portugal and Turkish Airlines have flights to Mozambique. At present, in addition to LAM, other airlines have also begun operating domestic routes in Mozambique. FastJet (https://www.fastjet.com/en) has opened routes to Beira, Tete and Nampula.
For more information on contact information for government agencies and airport companies, please see the following links: 4.1 Government Contact List and 4.4 Airport Company Contact List
Related procedures for foreign registered aircraft
Before provisioning a foreign registered aircraft, the following steps are required:
··Apply for a temporary air services license by an operator contracted to provide services. If the operator is not familiar with the situation in Mozambique, it is recommended to assist through a contact point (such as the WFP Maputo office and/or a local aviation consultancy).
··The United Nations Aviation Safety Agency requires foreign operators to ensure that the civil aviation authority of the country in which the aircraft is registered clearly assumes all safety oversight responsibilities during operations in Mozambique.
··The following operator, aircraft and crew documentation is required:
··Air Operator Certificate and Crew License
··Certificate of registration, airworthiness certificate, insurance certificate and maintenance release certificate
··For non-scheduled and private flights, overflight and landing permissions need to be requested from IACM 24 hours in advance.
··For flyby missions, flight plan item 18 needs to contain the following information:
··Aircraft registration number (if different from call sign), number of crew and passengers
··Color and nationality of the aircraft, purpose of flight, full postal and telegraphic address of the operator
··For landing, flight plan item 18 needs to contain the following information:
Aircraft registration (if different from call sign), names and nationalities of crew and/or passengers
··Name and address of contact unit, nature of goods, flight purpose, airport of entry
··Color and nationality of aircraft, complete postal and telegraphic address of operator.
··After submitting your application and documentation to IACM, please allow 7 to 10 days for approval.
In addition to the above, the Ministry of Foreign Affairs and Cooperation must issue a formal notification informing relevant government departments and agencies of the humanitarian organization’s mandate to respond to emergencies so that aviation regulators can make decisions.
5. Mozambique Logistics Infrastructure
Overview
Mozambique is a long and narrow country with an area of 801,537 square kilometers, with more than 2,500 kilometers of coastline and 4,500 kilometers of land borders, bordering Tanzania, Malawi, Zambia, Zimbabwe, South Africa and Swaziland. Its logistics infrastructure is designed to provide adequate access for inland traffic through an integrated port and rail system. The road network is designed as a feeder system around major urban areas, with north-south transport relying mainly on sea transport (cargo transport) and air transport (people transport).
Mozambique’s logistics infrastructure has developed significantly over the past decade, but it still faces many challenges in terms of its road network, rail, aviation, ports, waterways and warehousing.
Road network:
Mozambique’s road network is a vital artery for the country’s economy, connecting its agricultural heartland, urban centers and major ports to regional and global markets. This vast road network, which stretches over 30,562 kilometers, is crucial for Mozambique to become a trade gateway for its landlocked neighbors such as South Africa, Zimbabwe, Malawi, Zambia and Swaziland. Although Mozambique has invested heavily in improving and expanding road infrastructure, challenges such as climate vulnerability, maintenance issues and regional security instability remain severe.
Infrastructure Overview
Mozambique's road network is managed by the National Roads Administration (ANE) and has a total length of approximately 30,562 kilometers. The road network is divided into multiple levels to effectively meet different traffic needs. Major highways, called Estradas Nacionais (EN), total approximately 6,386 kilometers in length and connect major cities, ports, and border crossings. Secondary roads, called secondary roads (Estradas Secundárias), with a total length of 4,915 km, connect provincial capitals to important economic centers. Third-level roads, called Estradas Terciárias (Estradas Terciárias), serve rural and agricultural areas with a total length of 12,700 km. In addition, a total of 6,600 kilometers of unclassified roads or local roads (Estradas Vicinais) serve the transportation needs of local communities. The total length of urban roads is about 3,300 kilometers and is an important part of internal transportation in the city.
Despite its extensive coverage, the road network still faces many challenges. Currently, only 24% of roads (approximately 7,344 kilometers) are paved, mainly including major arterial roads such as EN1. As a result, the remaining 23,218 kilometers of unpaved roads are highly vulnerable to flooding and erosion, especially in rural areas where maintenance resources are scarce. The Second Generation Road Fund was established in 2007 to use fuel tax and toll revenue for road maintenance, but funding gaps remain.
In 2018, the Mozambican Road Network Company (REVIMO) was established to build and manage the Maputo Ring Road and the Maputo-Catembe Bridge. The success of this public-private partnership model, especially through charging high fees to finance road maintenance, prompted the government to expand its service scope to include Catembe-Ponta Duro (187 kilometers), Bellavista-Boane (6 kilometers) 3.35km), Beira-Machipanda (287km), Bilene-Masia (38.5km), Masia-Chokwe (61.7km) and Chokwe-Makaretane (21.8km).
Despite these efforts, only 60% of roads will be in good condition as of 2024, highlighting the urgent need for additional continued investment and maintenance.
Mozambique’s climate poses another threat to the integrity of the road network. Disasters such as Hurricanes Idai and Kenneth in 2019, Hurricane Judy in 2025, and seasonal flooding cause approximately 1,000 to 2,000 kilometers of road damage each year, and repair costs may be as high as $50 million. To mitigate these impacts, initiatives such as the World Bank’s $400 million Safe Roads for Economic Integration project prioritize climate-resilient road design.
Security concerns remain a concern in Mozambique. Between 2015 and 2025, the country's road traffic accident fatality rate was as high as 30 per 100,000 people. Reasons for this staggering death rate include poor road conditions, overloaded vehicles and poor enforcement of traffic laws. Traffic has grown at an annual rate of 15% since 2010, reflecting a booming economy and increased port activity, especially along the Maputo and Beira corridors, where some 1,600 heavy trucks pass through each day.
Investment and Development
Since 2000, Mozambique has received over US$2 billion in investment to improve road infrastructure. Funding sources include the World Bank, African Development Bank, Japan International Cooperation Agency (JICA) and numerous private partners. Among the projects worth noting include the Integrated Feeder Road Project (IFRDP) launched by the World Bank in 2020, which allocated US$110 million to repair feeder roads in hurricane-affected areas, thereby improving transportation conditions in rural areas. Another important initiative is the Southern Africa Trade and Connectivity Project, launching in 2023, which allocates US$500 million to upgrade roads along the Nacala Corridor to promote trade connectivity with Malawi and Zambia.
In addition, the ongoing N1 Highway Rehabilitation Project (2022-2027) is a comprehensive plan to improve the main north-south highway EN1 with a budget of US$850 million, aiming to improve connectivity and safety on this important 2,500 kilometer stretch. These projects demonstrate Mozambique’s commitment to modernizing its road infrastructure to meet growing trade and transport needs.
The public-private partnership (PPP) model has played a vital role in improving road traffic efficiency, as evidenced by successful projects such as the Maputo Corridor Toll Road. However, these cooperation models also face many challenges, such as high user fees that may deter users from using them, and regulatory ambiguity that can complicate operations.
Economic impact
The economic significance of Mozambique’s road network cannot be underestimated. As a key link between agricultural production areas and urban centers and ports, the road network facilitates important trade not only within Mozambique, but across southern Africa. It plays a vital role in supporting the movement of goods such as agricultural products from the central and northern provinces to the port for export. In addition, the road network is vital for transporting mineral resources mined in the interior to coastal areas, thereby contributing to the national economy.
Additionally, improvements in road infrastructure connect landlocked countries to the Indian Ocean, thereby boosting regional trade. This connectivity helps reduce trade costs, which is crucial for countries such as Zimbabwe and Zambia that rely on Mozambique’s ports to access global markets. Increased investment in road infrastructure is expected to stimulate the local economy, create jobs and promote economic development by ensuring that goods move efficiently and conveniently throughout the region.
In summary, Mozambique's road network is an important part of its economic framework, effectively connecting agricultural areas, urban centers and major ports, and facilitating trade with its landlocked neighbours. Despite many challenges, including climate risks and funding gaps, Mozambique has made significant efforts to modernize and improve its road network. Strategic investment and focused construction through public-private partnerships are key to improving the capacity and resilience of highway infrastructure. By addressing current challenges and leveraging infrastructure development to facilitate broader economic integration, Mozambique can continue to solidify its position as a key trading hub in southern Africa.
Impact
Mozambique’s road network is an important driver of its economy, facilitating trade, agricultural exports and connectivity across the southern African region. The road network has a total length of approximately 30,562 kilometers, connecting major ports, urban centers and rural areas, as well as with landlocked neighboring countries such as South Africa, Zimbabwe, Malawi, Zambia and Swaziland.
Main Route
Mozambique’s road network is organized around three major economic corridors—Maputo in the south, Beira in the center, and Nacala in the north—with the north-south trunk road EN1 as its core. Roads are divided into N/EN (national level) and R (regional level), and the main routes form the core of freight and passenger transport. Below are the main routes, geographical coverage and operational details.
1. EN1 (N1): North-South Corridor
Route: Maputo to Pemba (2,500 km), connecting Maputo, Xese, Mahise, Inchope, Gorongosa, Kaya, Mocuba, Nampula and Pemba.
Description: The longest road in Mozambique and the country's main north-south transportation artery. It connects the southern, central and northern provinces, intersects with corridor roads (such as the EN6 road in Inchope) and covers 56% of the population.
Current status: 80% of the road section is paved, the section north of Cabo Delgado requires military escort due to past insurgent activity (2021-2023). Restoration projects (2022-2027, $850 million) aim to improve safety and climate resilience.
Transportation: Handles 60% of the nation's freight, including agricultural products (cotton, sugar) and minerals (coal, lithium), and supports passenger transportation in major cities.
2. Maputo Corridor (South)
Main routes:
EN1 (N1): Maputo to Xéxé (160 km), extending north to Gaza and Inhambane provinces.
EN2 (N2): Maputo to Namacha (Swazi border, 70 km).
EN3 (N3): Junction with EN2 to Goba (Border Swaziland, 40 km).
EN4 (N4): Maputo to Resano Garcia (South African border, 90 km), part of the Maputo Corridor Toll Road.
Introduction: Connects the Port of Maputo with the South African provinces of Gauteng, Mpumalanga and Limpopo and Swaziland. The EN4 road is the busiest route, handling 1,600 heavy trucks every day and carrying an annual freight volume of 30 million tonnes.
Current status: The road is fully paved and equipped with modern toll infrastructure. Traffic congestion at the Resano Garcia border and the entrance to the port of Maputo is being addressed through the construction of a new five-lane road (expected to be completed in 2024).
Economic role: Facilitates exports of chrome ore and coal from South Africa and trade in citrus, sugar and cotton from Mozambique.
3. Beira Corridor (Central)
Main routes:
EN6 (N6): Beira to Machipanda (Zimbabwe border, 290 km), connecting Harare and Bulawayo.
EN1 (N1): From Inchop to Kaya, connecting via the Sena Railway to the Tete coalfields and Malawi.
Introduction: Connects the Port of Beira to Zimbabwe, Malawi and Tete Province, supporting trade in minerals and agricultural products. The EN6 highway is a key passage for the export of tobacco from Zimbabwe and coal from Mozambique.
Condition: 100% paved, repairs completed in 2020 following Cyclone Idai in 2019. Rural bypass roads remain unpaved and prone to flooding, limiting access during the rainy season.
EN7 (N7): 485 kilometers in total length, 90% of which are paved roads, connecting the EN6 highway with Zambia and Malawi, passing through Tete Province
Economic role: Supports the movement of 2.1 million tonnes of cargo annually (2019), 32% of which is transit cargo destined for Zimbabwe, Zambia and Malawi.
4. Nacala Corridor (North)
Main routes:
EN12 (N12): Nampula to Cuamba (350 km), extending to Lilongwe, Malawi.
EN13 (N13): Nampula to Nacala (200 km), serving the port of Nacala.
EN1 (N1): Nampula to Pemba, connecting the northern provinces (Nampula, Cabo Delgado).
Introduction: Connects the Port of Nakara to Malawi, Zambia and the Moatize coalfield in Tete Province. The N12 highway mainly transports agricultural products (tea, tobacco), while the N13 highway mainly transports coal and containers.
Road conditions: 60% of the road section is paved, with 300 kilometers of the N12 national highway being upgraded under a $500 million World Bank project (2023-2027). Insurgency in Cabo Delgado province has disrupted the northern route until 2023.
Economic role: Promote 2 million tonnes of cargo (2023), including coal and agricultural exports, and Malawi’s growing transit trade.
Economic impact
Mozambique’s road network is the cornerstone of its economic growth. Between 2000 and 2015, the road network promoted the country’s GDP growth by an average of 7.7% per year and supported the growth of agriculture, services and the extractive industry. The road-led transportation industry accounts for 10% of GDP, and roads facilitate 70% of agricultural products entering the market. Here are the key economic impacts of major highway routes.
1. Agricultural products market access
Function: EN1 highway and the roads along it connect rural farmers and markets, providing support for agricultural development, which absorbs 70% of the labor force. The EN1 road connects the cotton, sugar and tobacco producing areas of Zambezia and Nampula to the port, while a feeder road in Sofala enhances market access for maize and sesame.
Impact: The World Bank's Integrated Feeder Road Project (2020, US$110 million) improved rural transportation in Zambezi and Sofala states, increasing farmers' incomes in the project area by 15%. A 2021 study on the Zambezi Bridge showed that transportation costs were reduced by 3% to 7%, and the price of maize in the destination market was reduced by 5%.
Challenge: Only 30% of rural households have a road within 2 kilometers, limiting market integration for 70% of the population.
2. Regional trade
Function: The Maputo, Beira and Nacala corridors are trade routes for landlocked neighboring countries, with 30% of port cargo being transit cargo. The EN4 corridor supports South Africa's chromium exports, the EN6 corridor promotes Zimbabwe's tobacco trade, and the N12/N13 corridor safeguards Malawi's tea and tobacco exports.
Impact: Mozambique’s trade costs are only 60% of the sub-Saharan African average, and import and export times are only 70% of the regional average, mainly due to improved roads. The Southern Africa Trade and Connectivity Project (launched in 2023 with an investment of US$500 million) aims to reduce trade costs along the Nacala Corridor by 10% by 2027 and increase Malawi’s port capacity by 50%.
Challenges: Border delays at Resano Garcia (EN4) and Machipanda (EN6) increase transit times, while the northern insurgency (2021-2023) disrupts the N13 highway.
3. Economic growth and job creation
Impact: Road investments have led to $15 billion to $20 billion in private sector projects, especially in coal (Tete province) and liquefied natural gas (Cao Delgado province), creating 50,000 jobs since 2010. The rehabilitation of the EN1 road is expected to improve market access for 56% of the population, thereby driving growth in agriculture and tourism.
Impact: Road upgrades can reduce transportation costs by 5% to 10% and are expected to boost GDP growth by 0.5% per year (World Bank data). The Maputo corridor's EN4 road has an annual freight volume of 30 million tons, supporting the industrial development of Gauteng and Maputo.
Challenge: High road user charges on toll roads like EN4 deter small traders, while maintenance gaps add 20% to vehicle operating costs.
4. Challenges to economic impact
Climate vulnerability: Hurricanes and floods damage 1,000 to 2,000 kilometers of roads each year, causing losses equivalent to 1.1% of GDP. Cyclone Idai in 2019 disrupted the EN6 road, resulting in Beira market being cut off from the outside world.
Insurgency: Attacks in Cabo Delgado blocked the EN1 and N13 roads, halting LNG projects and causing $500 million in trade losses (2021-2023).
Urban-rural divide: Limited rural road access exacerbates poverty, with 70% of the population living in rural areas but only 19% of roads being paved.
Safety: 30.4 people died in road traffic crashes per 100,000 inhabitants in 2015-2019, hurting economic productivity.
Latest developments
EN1 Rehabilitation (2022-2027): The World Bank has allocated $400 million to upgrade 500 kilometers to improve safety and flood resilience.
Nacala Corridor Upgrade (2023): $200 million to pave 300 kilometers of N12 road, reducing transport times to Malawi by 20%.
Hurricane recovery (2019-2023): $110 million to repair 200 kilometers of roads in Sofala and Manica, reconnecting 100,000 households.
Maputo Traffic Management (2024): Five-lane access on EN4 road to Maputo Port aims to reduce delays by 30%.
Summary
Mozambique’s road network, centered on the EN1 highway and the Maputo, Beira and Nacala corridors, is the backbone of its economy, handling 40 million tonnes of cargo annually and facilitating trade with its southern African neighbors. The EN1 road connects 56% of the population, while corridor roads support agricultural exports and mineral trade, reducing trade costs to 60% of the regional average. While the road network creates jobs and boosts GDP growth, challenges such as climate vulnerability, insurgency and rural inaccessibility remain. Ongoing investments, including US$500 million in the Nacala corridor and US$400 million in the EN1 road, are expected to increase efficiency and consolidate Mozambique's position as a regional trade hub.
Aviation:
Currently, Mozambique’s aviation industry is relatively small, with only a handful of airlines operating in the country. National airline LAM Mozambique Airlines is the country's largest airline, providing domestic and international routes. Other airlines operating in Mozambique include TAP Portugal, Turkish Airlines, TAAG, Qatar Airways, Ethiopian Airlines, South African Airways, South African Airlink and Kenya Airways. In addition, the country has several small regional airlines serving remote areas.
The government has prioritized developing the aviation industry and plans to invest in new airport infrastructure, training programs for aviation professionals, and promoting Mozambique as a tourist destination.
Port:
Mozambique has a long coastline of about 2,500 kilometers, bordering the Indian Ocean, stretching from South Africa in the south to Tanzania in the north. The country's coast is dotted with several major ports, including Maputo, Beira and Nacala, which serve as important gateways for international trade with neighboring countries. In addition, there are smaller ports, such as Quelimane and Pemba, which mainly serve nearby businesses and communities.
In 2022, the Port of Maputo repaired, expanded and dredged a total of 1,058 meters of berth area, with a maximum depth of -16 meters. Some planned investment projects include:
Establishment of food terminals (cereals, sugar, vegetable oils, molasses),
Container terminal expansion
Intermodal Container Terminal (MICD) Expansion
Expansion of TCM (Mattola Coal Terminal) capacity to 12 Mtpa.
The Port of Beira has also benefited from some investments by Connell Group. The container terminal benefited from an investment that saw its container yard expanded to 3 hectares and a new five-lane approach road, with the possibility of adding two more lanes in the future. In addition, the terminal also invested in equipment such as terminal tractors, reach stackers, ro-ro tugs, forklifts and weighbridges. With the expansion of the yard, coupled with the use of tire-tyred gantry cranes (RTG), the port will be able to handle 700,000 standard units (TEU).
The cargo handling capacity of the Nacala Port in northern Mozambique has been increased from 100,000 TEU to 252,000 TEU per year after completing the restoration, expansion and modernization project, an increase of more than 150%. The project, to be completed in 2023, includes comprehensive restoration of port facilities, dredging, construction of access roads and equipment purchase. The restoration, expansion and modernization project was funded by the Japan International Cooperation Agency (JICA), totaling US$277.5 million.
The inner port of Quilima underwent rehabilitation of the quay and container terminal infrastructure and dredged the approach channel. The rehabilitation project expanded the handling capacity of the container and bulk cargo terminal, increasing the depth of the 200-meter-wide maneuvering water to 5 meters from the previous 2 to 3 meters.
In 2019, the Port of Pemba underwent extensive renovations and was equipped with modern equipment to handle multiple types of cargo, including graphite, marble, cotton, timber, and clinker. The port is now able to operate around the clock and has an annual throughput of up to 27,000 TEU, up from 18,000 TEU previously. CFM’s US$5 million investment is expected to improve the flow of goods at Pemba Port and reduce the need to transport goods to the port of Nacala, 400 kilometers away, thus avoiding damage to roads and saving time and resources.
Waterway:
Mozambique’s inland waterways have historically been important for transporting goods and people, but their utilization has been limited in recent years. The country has a vast network of inland waterways, including the Zambezi, Pungwe and Save rivers, with a total length of 3,750 kilometers. However, these waterways are underutilized due to insufficient investment in infrastructure and equipment, as well as the presence of natural obstacles such as sandbars and rapids.
In 2020, domestic maritime cargo transportation between ports restarted. However, coastal transport has proven unsustainable in the domestic market. Revitalizing coastal transport is a government initiative under the government's five-year plan 2020-2024 to reduce the cost of transporting goods, thereby lowering purchase prices for end consumers.
Storage:
Mozambique is divided into eleven provinces, each with its own unique warehousing needs and challenges. Overall, Mozambique’s warehousing infrastructure is limited, with many regions lacking sufficient warehousing capacity to meet their needs. Reliable storage facilities are often difficult to find, especially in rural areas.
In the southern province of Maputo, warehousing facilities are mainly concentrated in the capital city of Maputo. The city has several modern warehousing facilities, including large warehouses and cold storage. However, warehousing in Maputo is in high demand and many businesses struggle to find affordable warehousing solutions. In the central province of Sofala, storage facilities are more limited. The port city of Beira is the region's main gateway for imports and exports, but the city's warehousing facilities are often overwhelmed and struggle to cope with the port's massive cargo throughput. In the northern province of Cabo Delgado, storage facilities are even scarcer. The region's booming natural gas industry requires extensive warehousing space for equipment and supplies.
Business Contact
Mr. Zhou Tel: +86 13530227809 13530227809
_____END_____
Mozambique market access, Mozambique customs clearance, Mozambique customs, Mozambique logistics, Mozambique ports, Mozambique Airlines
